Will AI replace hydroelectric production managers?

The biggest change here is physical: systems like Boston Dynamics Spot / Spark / Bolt quadrupeds have done tasks such as “Inspect hydroelectric facilities, including switchyards” in real workplaces, about 39m of a typical shift. Most of the rest, 7h 21m, has no AI or robot evidence. BLS expects about 2.6% more of these jobs by 2035.

Time card for hydroelectric production managers showing a typical 8-hour shift: 7h 21m done by people, 39m by robots.
Each mark is 5 minutes of a typical shift for hydroelectric production managers, colored by who does that task today. Estimates from O*NET tasks and Anthropic Economic Index data. How it's made

Home / Management / Hydroelectric Production Managers

Manage operations at hydroelectric power generation facilities. Maintain and monitor hydroelectric plant equipment for efficient and safe plant operations.

Time card

Untick tasks you don't do, or set your own times.
MineTask, by time spentHumanWith AIAIRobot
Direct operations, maintenance, or repair of hydroelectric power facilities.1h 18m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Maintain records of hydroelectric facility operations, maintenance, or repairs.45m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Monitor or inspect hydroelectric equipment, such as hydro-turbines, generators, or control systems.45m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Supervise or monitor hydroelectric facility operations to ensure that generation or mechanical equipment conform to applicable regulations or standards.45m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Inspect hydroelectric facilities, including switchyards, control houses, or relay houses, for normal operation or adherence to safety standards.34m a shift · Robots deployed · e.g. Boston Dynamics Spot / Spark / Bolt quadrupeds
Why this label?Marked Robot because Boston Dynamics Spot / Spark / Bolt quadrupeds (in real use) has done this task in a real workplace. It shows a robot can do it somewhere, not that most hydroelectric production managers work alongside one. How labels work
Supervise hydropower plant equipment installations, upgrades, or maintenance.34m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Develop or review budgets, annual plans, power contracts, power rates, standing operating procedures, power reviews, or engineering studies.34m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Plan or coordinate hydroelectric production operations to meet customer requirements.28m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Check hydroelectric operations for compliance with prescribed operating limits, such as loads, voltages, temperatures, lines, or equipment.22m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Develop or implement projects to improve efficiency, economy, or effectiveness of hydroelectric plant operations.22m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Plan or manage hydroelectric plant upgrades.22m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Respond to problems related to ratepayers, water users, power users, government agencies, educational institutions, or other private or public power resource interests.17m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Identify and communicate power system emergencies.11m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Perform or direct preventive or corrective containment or cleanup to protect the environment.11m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Provide technical direction in the erection or commissioning of hydroelectric equipment or supporting electrical or mechanical systems.11m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Develop or implement policy evaluation procedures for hydroelectric generation activities.11m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work
Operate energized high- or low-voltage hydroelectric power transmission system substations, according to procedures and safety requirements.6m a shift · Robots deployed · e.g. One-click sequential control (station-side sequential control system)
Why this label?Marked Robot because One-click sequential control (station-side sequential control system) (in real use) has done this task in a real workplace. It shows a robot can do it somewhere, not that most hydroelectric production managers work alongside one. How labels work
Create or enforce hydrostation voltage schedules.6m a shift · No AI or robot evidence found
Why this label?No AI use or robot deployment showed up for this task in our data. That isn't proof it's safe; it may just be rare in the data. How labels work

Clock history

  1. 39m touchedFirst published: O*NET 30.1, Anthropic Economic Index (2025 usage and September 2026 robot study), BLS May 2025

When new data changes this clock, the date, the new numbers and the reason are logged here. Company news alone never moves the clock.

On the floor

No company news tracked for this job yet. New stories are added as they happen.

Ask the clock

Will AI replace hydroelectric production managers?

Unlikely, though parts of the work are changing. About 39m of an 8-hour shift goes to tasks touched by robots. The other 7h 21m (92%) stays with people. Separately, BLS expects about 2.6% more of these jobs by 2035 (all jobs: +3.5%).

What can AI already do for hydroelectric production managers?

None of this job's tasks show regular AI use yet. That can mean the work is hands-on or in person, or simply that it rarely comes up in AI usage data.

Where do robots fit in?

For some tasks, yes. Robots have done 2 of this job's tasks in workplaces like this one, about 39m of a typical shift.

  • Inspect hydroelectric facilities, including switchyards, control houses, or relay houses, for normal operation or adherence to safety standards. (34m a shift; e.g. Boston Dynamics Spot / Spark / Bolt quadrupeds, in use)
  • Operate energized high- or low-voltage hydroelectric power transmission system substations, according to procedures and safety requirements. (6m a shift; e.g. One-click sequential control (station-side sequential control system), in use)
What still needs a person?

7h 21m of a typical shift, or 92%, goes to tasks with no AI or robot evidence yet. No AI usage or robot deployment has shown up for these so far. The biggest:

  • Direct operations, maintenance, or repair of hydroelectric power facilities. (1h 18m a shift)
  • Maintain records of hydroelectric facility operations, maintenance, or repairs. (45m a shift)
  • Monitor or inspect hydroelectric equipment, such as hydro-turbines, generators, or control systems. (45m a shift)
  • Supervise or monitor hydroelectric facility operations to ensure that generation or mechanical equipment conform to applicable regulations or standards. (45m a shift)
  • Supervise hydropower plant equipment installations, upgrades, or maintenance. (34m a shift)
Why is that work hard to automate?

Much of it comes down to where and how the work happens. In-person, hands-on and high-stakes work is where AI and robots have made the least headway so far. In the official O*NET survey of people in this job:

  • 100% carry high or very high responsibility for other workers' safety
  • 83% talk face to face with others every day
  • 78% say a mistake would be very or extremely serious
Are employers still hiring hydroelectric production managers?

On Indeed, job postings in the Management sector are at 104% of their February 2020 level (all U.S. postings: 104%), up 8.3% from a year earlier, as of Oct 9, 2026. BLS separately expects about 17,000 openings a year in this job through 2035. Across all U.S. postings, 7.3% now mention AI skills. Sector postings cover more than this one job and move for many reasons besides AI.

How much do hydroelectric production managers make?

The median pay is about $126,060 a year ($60.61 an hour), 147% above the median for all U.S. jobs ($50,980). Most people in this job earn between $78,000 and $205,520 a year; that range covers the middle 80%. Pay figures are from BLS, May 2025, and vary a lot by state and employer. Pick a state to compare:

Is this job growing or shrinking?

BLS projects growth of 2.6% from 2025 to 2035, compared with 3.5% growth for all jobs. That's about 259,000 jobs in 2035. It expects about 17,000 openings a year, mostly from people retiring or changing careers. These projections don't single out AI as a cause.

How many hydroelectric production managers are there in the U.S.?

About 246,000 people in the U.S., roughly 0.16% of all workers (BLS, May 2025). That makes it the 153rd largest of the 796 jobs on this site. BLS expects about 259,000 in 2035.

What training do hydroelectric production managers need?

The most common requirement is a post-secondary certificate: about 29% of people in the job said so in the official O*NET survey. O*NET rates the job at level 3 of 5 for preparation, which usually means: vocational school or associate's degree. Requirements vary by state and employer, especially for licensed work.

What should I learn to stay ahead of AI?

These come from the job's official skill ratings and from the tasks that AI and robots touch least today. Building them keeps you strong in the parts of the work that still need a person:

  • Skills that matter more here than in most jobs: Management of Material Resources, Management of Financial Resources, Management of Personnel Resources, Time Management
  • Get strong at the parts of the job that stay with people (listed above), which take 7h 21m of a typical shift
  • Tools employers list: Apache Kafka, Microsoft Access, Microsoft Active Server Pages ASP, Microsoft Excel, Microsoft Office software
What new tasks are hydroelectric production managers taking on?

Yes. Occupational experts recently added these to the official task list, a sign of how the work itself is shifting. New tasks aren't rated for AI or robots yet:

  • Train employees in power plant operations.
What other jobs could hydroelectric production managers move into?

These use similar skills, with less of a typical shift touched by AI or robots. Matches come from 109 official ratings of skills, knowledge and work activities, and each needs the same or less preparation unless the official list relates the jobs directly:

  • Wind Energy Operations Managers (0m touched, $142k median pay)
  • Facilities Managers (0m touched, $107k median pay)
  • Biofuels Production Managers (0m touched, $126k median pay)
How solid are these numbers?

Each task carries its own evidence label. For this job: 2 with robots in real deployments, 16 with no AI or robot evidence found. The minutes per task are estimates, not measured hours, and "no evidence" doesn't prove a task is safe.

Tools in demand

  • Apache Kafka
  • Microsoft Access
  • Microsoft Active Server Pages ASP
  • Microsoft Project
  • Microsoft SQL Server

Plus everyday office tools: Microsoft Excel, Microsoft Office software, Microsoft PowerPoint.

Also called

Demand Generation Manager, Generation Manager, Hydroelectric Generation Manager (Hydro Generation Manager), Hydroelectric Generation Supervisor (Hydro Generation Supervisor), Hydroelectric Plant Site Manager (Hydro Plant Site Manager), Hydroelectric Production Manager, Hydroelectric Station Chief, Hydroelectric Station Supervisor (Hydro Station Supervisor), Plant Manager, Plant Site Leader, Power Plant Superintendent, Power Plant Supervisor, Power Project Manager, Production Manager