Estimate operational costs with AI?

Mining and Geological Engineers, Including Mining Safety Engineers spend the most time on it, about 40m a shift. Of the 18 jobs that do it, 1 have AI or robot evidence.

Home / Tasks / Estimate operational costs

In 1 of the 18 jobs that do this, AI or robots already show up on it, most often as work people hand to AI. In the other 17, there's no evidence yet. Jobs spend a median of 17m of an 8-hour shift on it, and about 3.0 million U.S. workers hold these jobs.

17No evidence yet
1Often handed to AI

Every job that does this

Each job words the task its own way. Minutes are that job's estimate for a typical shift; the label is the evidence for that job's version.

Job and its version of the taskPer shiftEvidence
Mining and Geological Engineers, Including Mining Safety EngineersPrepare schedules, reports, and estimates of the costs involved in developing and operating mines.40mNo evidence yet
Industrial EngineersEstimate production costs, cost saving methods, and the effects of product design changes on expenditures for management review, action, and control.34mNo evidence yet
Chemical EngineersPrepare estimate of production costs and production progress reports for management.32mNo evidence yet
Civil Engineering Technologists and TechniciansDevelop plans and estimate costs for installation of systems, utilization of facilities, or construction of structures.30mNo evidence yet
Civil EngineersEstimate quantities and cost of materials, equipment, or labor to determine project feasibility.29mNo evidence yet
Transportation EngineersEstimate transportation project costs.19mNo evidence yet
Industrial Engineering Technologists and TechniciansAnalyze, estimate, or report production costs.19mNo evidence yet
Mechatronics EngineersDetermine the feasibility, costs, or performance benefits of new mechatronic equipment.19mNo evidence yet
Automotive EngineersDevelop engineering specifications or cost estimates for automotive design concepts.17mNo evidence yet
Manufacturing EngineersEstimate costs, production times, or staffing requirements for new designs.17mNo evidence yet
Dietetic TechniciansDetermine food and beverage costs and assist in implementing cost control procedures.12mNo evidence yet
Electrical and Electronic Engineering Technologists and TechniciansCalculate design specifications or cost, material, and resource estimates, and prepare project schedules and budgets.12mNo evidence yet
Bioengineers and Biomedical EngineersPrepare project plans for equipment or facility improvements, including time lines, budgetary estimates, or capital spending requests.12mNo evidence yet
Electrical EngineersEstimate labor, material, or construction costs for budget preparation purposes.11mOften handed to AI
Architectural and Civil DraftersDetermine quality, cost, strength, and quantity of required materials, and enter figures on materials lists.6mNo evidence yet
Mechanical Engineering Technologists and TechniciansEstimate cost factors including labor and material for purchased and fabricated parts and costs for assembly, testing, or installing.6mNo evidence yet
Electronics EngineersPrepare budget or cost estimates for equipment, construction, or installation projects or control expenditures.6mNo evidence yet
Mechanical EngineersCalculate energy losses for buildings, using equipment such as computers, combustion analyzers, or pressure gauges.6mNo evidence yet

How to read this

This task type comes from O*NET's detailed work activities, which link similar tasks across jobs. A label applies to one job's version of the task: AI use comes from real AI conversations (Anthropic Economic Index) and robot evidence from deployments in real workplaces. "No evidence yet" may just mean the task is rare in the data. How we keep time.

See all 250 shared tasks, or find any job on the big clock.