Home / Tasks / Mark reference points on construction materials
In 12 of the 23 jobs that do this, AI or robots already show up on it, most often as robots doing it. In the other 11, there's no evidence yet. Jobs spend a median of 23m of an 8-hour shift on it, and about 3.8 million U.S. workers hold these jobs.
Every job that does this
Each job words the task its own way. Minutes are that job's estimate for a typical shift; the label is the evidence for that job's version.
| Job and its version of the task | Per shift | Evidence |
|---|---|---|
| Carpet InstallersRoll out, measure, mark, and cut carpeting to size with a carpet knife, following floor sketches and allowing extra carpet for final fitting. | 1h 7m | No evidence yet |
| CarpentersMeasure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge. | 47m | No evidence yet |
| Sheet Metal WorkersLay out, measure, and mark dimensions and reference lines on material, such as roofing panels, using calculators, scribes, dividers, squares, or rulers. | 40m | No evidence yet |
| Quarry Rock SplittersMark dimensions or outlines on stone prior to cutting, using rules and chalk lines. | 40m | No evidence yet |
| Drywall and Ceiling Tile InstallersMeasure and mark surfaces to lay out work, according to blueprints or drawings, using tape measures, straightedges or squares, and marking devices. | 39m | Robots |
| Floor LayersMeasure and mark guidelines on surfaces or foundations, using chalk lines and dividers. | 33m | Robots |
| Plasterers and Stucco MasonsInstall guide wires on exterior surfaces of buildings to indicate thickness of plaster or stucco and nail wire mesh, lath, or similar materials to the outside surface to hold stucco in place. | 30m | No evidence yet |
| Brickmasons and BlockmasonsMeasure distance from reference points and mark guidelines to lay out work, using plumb bobs and levels. | 27m | Robots |
| Fence ErectorsMeasure and lay out fence lines and mark posthole positions, following instructions, drawings, or specifications. | 26m | Robots |
| StonemasonsLay out wall patterns or foundations, using straight edge, rule, or staked lines. | 24m | Robots |
| Segmental PaversDesign paver installation layout pattern and create markings for directional references of joints and stringlines. | 24m | No evidence yet |
| Plumbers, Pipefitters, and SteamfittersLocate and mark the position of pipe installations, connections, passage holes, or fixtures in structures, using measuring instruments such as rulers or levels. | 23m | Robots |
| Explosives Workers, Ordnance Handling Experts, and BlastersMark patterns, locations, and depths of charge holes for drilling, and issue drilling instructions. | 22m | Robots |
| First-Line Supervisors of Construction Trades and Extraction WorkersLocate, measure, and mark site locations or placement of structures or equipment, using measuring and marking equipment. | 20m | Robots |
| Tile and Stone SettersMeasure and mark surfaces to be tiled, following blueprints. | 19m | No evidence yet |
| PipelayersLay out pipe routes, following written instructions or blueprints and coordinating layouts with supervisors. | 18m | Robots |
| BoilermakersLay out plate, sheet steel, or other heavy metal and locate and mark bending and cutting lines, using protractors, compasses, and drawing instruments or templates. | 17m | No evidence yet |
| PaperhangersMark vertical guidelines on walls to align strips, using plumb bobs and chalk lines. | 13m | No evidence yet |
| Helpers for CarpentersHold plumb bobs, sighting rods, or other equipment to aid in establishing reference points and lines. | 12m | Robots |
| GlaziersMeasure and mark outlines or patterns on glass to indicate cutting lines. | 12m | No evidence yet |
| Construction LaborersMeasure, mark, or record openings or distances to layout areas where construction work will be performed. | 12m | Robots |
| Paving, Surfacing, and Tamping Equipment OperatorsSet up forms and lay out guidelines for curbs, according to written specifications, using string, spray paint, and concrete or water mixes. | 11m | No evidence yet |
| Highway Maintenance WorkersMeasure and mark locations for installation of markers, using tape, string, or chalk. | 6m | Robots |
How to read this
This task type comes from O*NET's detailed work activities, which link similar tasks across jobs. A label applies to one job's version of the task: AI use comes from real AI conversations (Anthropic Economic Index) and robot evidence from deployments in real workplaces. "No evidence yet" may just mean the task is rare in the data. How we keep time.
See all 250 shared tasks, or find any job on the big clock.
